GB grid connection evidence

Great Britain’s connection queue, with the source beside every figure.

Grid Guardian brings NESO’s TEC Register, all six DNOs’ Embedded Capacity Registers, planning and contract records and live grid data into one workspace, for developers, investors and their advisers.

Grid Guardian is available by invitation.

The Projects section of Grid Guardian: 2,083 project IDs in NESO’s TEC Register of 10 November 2026, each with its technology, capacity, connection site, gate, effective date and evidence.
The dossier of Strathy South Wind: its stage, capacity, effective date and transmission owner as NESO publishes them, its planning record and CfD contract linked, and its evidence scored.
The Grid Guardian workspace, reading NESO’s TEC Register of 10 November 2026.

How it works

From the publishers’ files to your evidence

Grid Guardian reads each publisher’s own file on its own schedule, keeps what it reads, and shows every figure with its source beside it.

Read from

  • NESOTEC Register, reform and tariffs
  • The six DNOscapacity registers and headroom
  • Elexongeneration and balancing
  • DESNZplanning database
  • Low Carbon Contracts CompanyCfD contracts
  • Companies Housecompany records
Grid Guardian

Grid Guardian in figures

Transmission projects
2,083project IDs in NESO’s TEC Register of 10 November 2026
Distribution connections
2,732of 1 MW and over accepted to connect, in 6 DNOs’ registers
Sources
63each cited with its publisher, date and licence
Register history
Since 2014NESO’s archived TEC Registers, month by month

As Grid Guardian showed them on 11 November 2026.

Project screening

Screen every project in the queue

Every project in NESO’s TEC Register, 2,083 project IDs on 10 November 2026, with its gate, technology, connection site, transmission owner and the date it takes effect. One switch turns the same view to the DNOs’ registers.

The project register in close-up: the switch between NESO’s transmission register and the DNOs’ registers, the filters, and the projects whose effective dates have moved most, each with its capacity, connection site, gate, date, months moved and evidence.
The project register, the projects whose effective dates have moved most first, as Grid Guardian showed it on 11 November 2026.
  • Filter it your way

    By technology, size, gate, connection site, year and status. The filters travel in the link, so a colleague opens the same list.

  • See what moved

    Months moved shows how far each project’s effective date has shifted since an earlier NESO publication you choose.

  • Evidence at a glance

    Grid, planning, route to market and ownership, marked against every project.

  • Export, watch and follow

    Export what you see, watch the projects you care about, and follow a project, a site or a customer by feed.

Project dossier

Open any project and see the whole case

A project’s dossier puts what NESO publishes beside the planning, contract and company records that bear on it, each marked with where it came from and whether a person has confirmed it.

  • Its record, dated

    Stage, capacity, effective date and transmission owner as NESO publishes them, with each change of status its archived registers record.

  • Planning and contracts, confirmed

    DESNZ planning records and CfD contracts are matched as candidates and count only once a person has confirmed them. On a planning link, Jev gives a second opinion; a person decides.

  • Evidence, scored

    How much of the project is backed by a record Grid Guardian keeps or a link a reviewer confirmed, and how far its milestones have got, each out of 100.

  • An evidence pack to keep

    The source rows, the matching method and your review history, in one download.

The dossier of Strathy South Wind: its stage, capacity, effective date and transmission owner as NESO publishes them, its planning record and CfD contract linked, and its evidence scored.
The dossier of Strathy South Wind, as Grid Guardian showed it on 11 November 2026.

Distribution networks

All six DNOs, project by project

Each DNO’s Embedded Capacity Register is read from its own portal. Every connection of 1 MW and over is one you can open, watch, filter and export, beside the transmission queue rather than added to it.

  • UK Power Networks

    Embedded Capacity RegisterDemand headroom
  • National Grid Electricity Distribution

    Embedded Capacity RegisterDemand headroom
  • SSEN Distribution

    Embedded Capacity RegisterDemand headroom
  • SP Energy Networks

    Embedded Capacity RegisterDemand headroom
  • Northern Powergrid

    Embedded Capacity RegisterDemand headroom
  • Electricity North West

    Embedded Capacity RegisterDemand headroom
  • Every monthly register, kept

    A DNO replaces its Embedded Capacity Register every month and keeps no history. Grid Guardian keeps each one, so a target date that slips leaves a trace.

  • Headroom side by side

    Each DNO’s own estimate of demand headroom at its substations, listed together in Where to connect, in the unit the DNO states.

  • Flexible or firm

    Flexible (ANM) connections are told apart from firm ones, as each DNO publishes them.

  • Never added to TEC

    Distribution megawatts are contracted volume. They are kept apart from the transmission queue and never added to it.

The dossier of a distribution connection, Former raf, from National Grid Electricity Distribution’s Embedded Capacity Register of 14 August 2026: its accepted capacity, target energisation date and point of connection as the DNO publishes them, and how many others are accepted to connect at its grid supply point.
A distribution connection’s dossier, from National Grid Electricity Distribution’s register of 14 August 2026, as Grid Guardian showed it on 11 November 2026.

The grid map

The whole queue on one map

See where contracted capacity sits on Great Britain’s transmission network, then narrow it down.

  • Filter by technology, connection state and gate.

  • Play the queue forward to the year each step takes effect.

  • Add circuits, boundaries, interconnectors and the data centre pipeline.

  • Open any site to see its projects and where each figure comes from.

The Grid Guardian grid map: connection sites across Great Britain’s transmission network, sized by contracted megawatts and coloured by technology, with the largest sites listed beside it.

The workspace

Everything else, in the same place

Grid Guardian reads the registers that decide where and when a project can connect, keeps every publication it reads, and shows what each one says, side by side.

  • Where to connect

    Name a place and see what the published registers say near it: the nearest connection sites and what is contracted there, distribution headroom, planning records and designations, and an indicative TNUoS charge.

  • Register changes

    NESO republishes the TEC Register twice a week. Every change is dated and listed project by project, with planning changes beside them.

  • Connections Reform

    Who is consenting to Gate 2 terms, from NESO’s Existing Agreements Register, and each project’s gate as the register prints it.

  • Grid charges

    Transmission charges from NESO’s final TNUoS tariffs for 2026/27.

  • Constraint costs

    NESO’s monthly constraint costs, beside what wind farms were paid to turn down and what gas plants were paid for accepted offers, from Elexon.

  • Europe live

    GB generation and interconnector flows from Elexon, with European prices and border flows from ENTSO-E.

  • Data centres

    The data centre pipeline, operational sites and AI Growth Zones, on the map beside the connection queue.

  • Companies House

    The company behind a customer name, from its Companies House record, cited by company number.

  • API and MCP server

    The same answers, each figure cited, for your own tools and for AI assistants.

Built on published data

Evidence you can check

Every figure in Grid Guardian is read from someone else’s publication, and it stays traceable to it.

  • Cited to the publication

    Every figure names the publication it came from, its date and its licence, ready to paste into a report.

  • Kept, byte for byte

    Each publication it captures is kept with the address it came from, the date it was fetched and a SHA-256 of its bytes.

  • Nothing filled in

    Where a publisher leaves a figure blank, Grid Guardian leaves it blank, and it says when a newer publication exists.

  • Clear about what it is not

    Contracted capacity is not capacity built, and it is not network headroom. Grid Guardian says so wherever it matters.

Sources and tools

Every source and tool, named

Grid Guardian cites 63 sources from the publishers below, each with its publication, date and licence. Grid Guardian publishes no data of its own.

Transmission

  • NESO · TEC Register, Existing Agreements Register, Interconnector Register, ETYS boundaries, TNUoS tariffs, GSP regions, constraint flows and costs, and carbon intensity

Distribution

  • The six DNOs · UK Power Networks, National Grid Electricity Distribution, SSEN Distribution, SP Energy Networks, Northern Powergrid and Electricity North West: each one’s Embedded Capacity Register and demand headroom
  • Each DNO’s files, kept · every monthly register and headroom file, compared by Grid Guardian

Markets and balancing

  • Elexon · BMRS: generation by fuel, demand, balancing acceptances and BM unit cashflows
  • ENTSO-E · border flows and day-ahead prices, read through Rebase’s Grid API
  • Fraunhofer ISE · Energy-Charts: European generation, interchange and prices
  • European Central Bank · euro reference rates, through the Frankfurter API

Planning and consents

  • DESNZ · Renewable Energy Planning Database
  • Planning Inspectorate · national infrastructure projects
  • Scottish Government · Energy Consents Unit cases
  • MHCLG Planning Data · designations such as green belt and SSSIs, and local planning authorities
  • PlanIt · planning applications

Contracts and companies

  • Low Carbon Contracts Company · CfD contract portfolio
  • Companies House · company profiles, by company number

Places and maps

  • OpenStreetMap contributors · substations, read through Overpass and OpenGridMap
  • PyPSA-GB · substation coordinates
  • gb-grid · wind BM unit positions
  • ONS Postcode Directory · postcode lookups, through postcodes.io
  • Natural Earth · the coastline and place names
  • OpenFreeMap · street tiles, from OpenStreetMap data

Data centres

  • Global Data Center Map · data centre sites, by Ringmast4r
  • thirsty-ai · data centre sites, by Yenlik Gaisina
  • gov.uk · AI Growth Zones and Section 35 directions
  • Developers and the press · public statements, each linked from its evidence row

The tools behind it

  • Jev

    TypeSafe, on Cloudflare Workers AI

    A second opinion on whether a planning record is the project it was matched to. Advice only: it never confirms or rejects a link; a person does.

  • Grid Guardian Worker

    On Cloudflare Workers

    Reads each publisher’s newest file on its own schedule, the TEC Register every hour, and keeps what it reads.

  • Rebase Grid API

    Rebase

    ENTSO-E’s border flows and day-ahead prices, for Europe live and the interconnectors on the map.

  • API and MCP server

    Grid Guardian

    Every answer with its data, its sources and its limits, for your own tools and for AI assistants.

Get started

Request access or a demo

Tell us who you are and what you are working on. We will reply by email to set up access or a demo.

  1. 1Send the form. It comes straight to us.
  2. 2We reply by email, and arrange a demo if you asked for one.
  3. 3You receive your own PIN to sign in with.

Already have a PIN? Sign in.

I would like

We use your details only to reply to you. Read our privacy notice.